Navigating the National Electrical Code (NEC) is fundamental to delivering safe and reliable solar and energy storage systems. Specifically, NEC Article 690 for Solar Photovoltaic (PV) Systems and Article 706 for Energy Storage Systems (ESS) provide the essential framework for installers. Yet, compliance audits often reveal recurring errors that can lead to costly project delays and rework. Understanding these common pitfalls is the first step toward ensuring every installation is safe, efficient, and code-compliant from the start.

Mistake #1: Inadequate or Incorrect Labeling
Proper labeling is one of the most critical safety features of a PV-ESS installation, yet it is a frequent source of compliance failures. These labels are not just a formality; they provide first responders and service technicians with immediate, life-saving information about the system's nature and how to de-energize it safely.
The Vital Role of Clear Communication
Auditors look for precise, durable, and correctly placed labels that communicate potential hazards and system specifics. This includes marking disconnects, rapid shutdown switches, and equipment with multiple power sources. Every label must be legible and able to withstand the environment in which it is placed. The goal is to eliminate any ambiguity about the system's operation, especially during an emergency.
Common Labeling Errors to Avoid
Simple mistakes in labeling can trigger an immediate audit failure. These often include missing voltage and current ratings, incorrect or unclear rapid shutdown maps, and a failure to properly identify all power sources feeding a piece of equipment. Installers should double-check that all disconnects are clearly marked and that conduits carrying DC conductors are appropriately identified. A small investment in a comprehensive labeling kit and a systematic approach can prevent significant headaches.
| Common Error | NEC Compliant Solution | Why It Matters |
|---|---|---|
| Missing 'PV System Disconnect' label | Clearly label the main PV system disconnect with a permanent, weather-resistant sign. | Allows for quick and unambiguous system shutdown by emergency personnel. |
| No directory plaque for multiple power sources | Install a plaque at the main service panel detailing the location of all power sources (utility, PV, ESS). | Informs anyone working on the electrical system that multiple sources may be active. |
| Unlabeled DC conduits | Label conduits carrying PV system DC conductors every 10 feet. | Prevents accidental cutting of live DC wires, which carry significant shock and arc-flash hazards. |
Mistake #2: Improper Wiring and Conductor Management
The integrity of a PV-ESS installation depends heavily on correct wiring practices. From sizing conductors to securing them properly, errors in this area can create serious fire and safety hazards, making it a key focus for inspectors.
Sizing Conductors for Ampacity and Conditions
One of the most fundamental errors is undersizing conductors. Wires must be sized to handle the maximum possible current, with adjustments for ambient temperature and the number of current-carrying conductors in a conduit (conduit fill). An undersized wire can overheat, leading to insulation failure and a potential fire. Auditors will verify these calculations against the system's specifications and NEC tables.
Securing and Protecting Conductors
Conductors must be protected from physical damage. This involves using the correct type of conduit for the environment, ensuring proper support and strapping, and using appropriate fittings. Inspectors frequently find issues such as exposed single-conductor wires outside of a raceway, insufficient strain relief on connections, or outdoor wiring not rated for UV exposure. Each of these represents a compliance failure and a long-term reliability risk.
Mistake #3: Misunderstanding Rapid Shutdown Requirements
Rapid shutdown systems (RSS) are a critical safety requirement under NEC 690, designed to protect firefighters from shock hazards on rooftops. However, the rules governing their implementation are complex and often misinterpreted.
Defining and Respecting the 'Array Boundary'
A primary point of confusion is the 'array boundary,' typically defined as 1 foot from the array in all directions. Inside this boundary, controlled conductors must be reduced to 80 volts or less within 30 seconds of shutdown initiation. Outside the boundary, they must be reduced to 30 volts or less in the same timeframe. Failing to meet these voltage and time limits, or misinterpreting the boundary, is a common and serious compliance failure.
Component Mismatch and Testing Failures
An RSS is a complete system, not just a collection of parts. The initiator (the switch) and the rapid shutdown device (often integrated into the inverter or at the module level) must be listed and certified for use together. Using unlisted combinations is a red flag for auditors. Furthermore, inspectors will often test the system's functionality. If the system fails to operate as designed, the audit stops there.
Mistake #4: Neglecting Equipment Grounding and Bonding
Proper grounding and bonding are non-negotiable for electrical safety. They create a safe path for fault currents to flow, preventing metal components from becoming dangerously energized. Auditors scrutinize these connections with great care.
Grounding vs. Bonding
It's useful to distinguish between these two related concepts. Grounding connects the system's electrical components to the earth via a grounding electrode conductor. This protects against lightning and stabilizes system voltage. Bonding involves connecting all metallic parts that could become energized (racking, enclosures, conduits) to create a continuous low-impedance path back to the source, allowing breakers to trip during a fault.
Typical Grounding and Bonding Faults
Common failures include using an undersized grounding electrode conductor, making loose connections that can corrode over time, and failing to bond all sections of the PV module racking. Inspectors will check the continuity of the bonding path and verify that all hardware used is listed for grounding.
Mistake #5: Missing or Inaccurate System Diagrams
Clear documentation is a core part of a safe and compliant installation. Auditors require accurate diagrams to verify that the system was installed as designed and to provide a reference for future service work.
The Single-Line Diagram Requirement
Most jurisdictions require a detailed single-line diagram to be posted at the main service disconnect. This diagram must show all major components (modules, inverters, batteries, disconnects), conductor sizes, and overcurrent protection device ratings. An inaccurate or missing diagram suggests a lack of professional planning and is a clear compliance violation.
Mistake #6: Overlooking Battery-Specific Requirements (NEC 706)
With the rise of energy storage, NEC Article 706 has become increasingly important. Batteries introduce unique considerations that go beyond standard PV installations.
Ventilation and Spacing for Safety
Energy storage systems require adequate spacing for cooling and maintenance access. Some battery chemistries also require ventilation to prevent the accumulation of hazardous gases. An auditor will check the manufacturer's installation manual and verify that NEC-mandated clearances and ventilation requirements have been met. This is crucial for both system performance and safety.
ESS Disconnecting Means and Performance
An ESS must have a readily accessible disconnect to isolate it from the rest of the system. Common mistakes include placing this disconnect in an inaccessible location or failing to label it correctly. Beyond just the disconnect, a compliant system is one that performs as expected. Understanding key metrics like Depth of Discharge (DoD) and cycle life is crucial for both compliance and system longevity. As detailed in the ultimate reference for solar storage performance, a well-designed system considers these factors from the start.
Mistake #7: Relying on Outdated Code Knowledge
The solar and storage industries are evolving rapidly, and so is the NEC. Relying on old information is a recipe for failure.
The Evolving Nature of the NEC
The NEC is updated every three years, with each new edition introducing significant changes to Articles 690 and 706. Furthermore, local jurisdictions (the Authority Having Jurisdiction, or AHJ) adopt these new codes at their own pace. Designing a system based on the 2017 NEC when the local AHJ has adopted the 2020 or 2023 version will lead to non-compliance. As noted by the International Energy Agency, the implementation of standards and mandatory audits is a global trend to enhance system performance and safety. A report on Energy Policies beyond IEA Countries: Morocco 2019 shows how regulations are introduced to enforce audits for large energy consumers, a principle that applies to ensuring compliance in all electrical installations.
Staying Current and Proactive
The best strategy is to always confirm the locally adopted code version before starting any design work. Investing in ongoing education and training is essential for all installers. Proactively communicating with the local AHJ can also clarify any specific interpretations or requirements before they become problems during the final inspection.
Proactive Compliance for Successful Projects
Avoiding these seven common mistakes moves an installation from merely functional to truly professional. Adherence to NEC 690 and 706 is not about navigating red tape; it is about a fundamental commitment to safety, quality, and reliability. By focusing on meticulous labeling, proper wiring, understanding rapid shutdown, ensuring solid grounding, providing clear documentation, respecting ESS specifics, and staying current with code, you can ensure your projects pass inspection smoothly and stand as a testament to quality workmanship.
Disclaimer: This article provides general information and is not a substitute for professional engineering or legal advice. Always consult the current National Electrical Code and your local Authority Having Jurisdiction (AHJ) for specific requirements.
Frequently Asked Questions
What is the main difference between NEC 690 and NEC 706?
NEC Article 690 specifically covers the requirements for solar photovoltaic (PV) systems, including panels, inverters, and associated wiring. NEC Article 706 is dedicated to Energy Storage Systems (ESS), detailing the installation requirements for batteries and their control equipment.
How often should I check for NEC code updates?
The NEC is updated on a three-year cycle. However, the most critical step is to always verify which version of the code your local Authority Having Jurisdiction (AHJ) has adopted before beginning any project design or installation.
Can I use components from different manufacturers for my rapid shutdown system?
You can only use them if they are specifically listed and identified for use together. The NEC requires that all parts of a rapid shutdown system are certified to work as a complete system. Mismatching components without proper certification is a common compliance failure.
Is a single-line diagram always required?
While requirements can vary slightly by jurisdiction, it is a best practice and often mandatory to have an accurate, permanent single-line diagram posted at a visible location, such as the main service disconnect. It provides essential information for maintenance and emergency personnel.




Leave a comment
All comments are moderated before being published.
This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.